What We Do

Services

Every deck service, from a first build to keeping an old one standing.

Home › Services

Everything we take on

Every job below is one we do ourselves across Socorro.

Deck Installation

We frame new decks from the ground up, setting footings below frost depth and bolting the ledger board straight into the house framing. Works for ground-level platforms or raised decks with stairs down to the yard.

Deck Repair

Soft or spongy boards, posts that have started to lean, railings that wobble when you grab them, we find the actual cause instead of just swapping the board you noticed. Sometimes the fix is one joist, sometimes the ledger connection has failed and it's a bigger job.

Deck Staining & Sealing

Wood decks in this sun require a fresh coat of sealer every two to three years or the boards start to gray and crack. We pressure wash, let it dry fully, then seal, which matters more than the brand of stain you pick.

Custom Deck Design

Multi-level decks, built-in benches, pergolas over part of the deck, we'll draw it out before we cut anything. Your yard's slope and the house's existing doors usually decide more of the layout than people expect.

Deck Railing Installation

Baluster spacing has to stay under 4 inches apart by code, and the post connection matters more than the railing style you pick. We've replaced plenty of railings that looked fine until someone leaned on them.

Composite Decking

Composite boards don't rot, splinter or require staining, but they cost more upfront and get hot underfoot in July. We'll tell you honestly whether it's worth it for your budget and how much you use the deck.

Deck Resurfacing

If the frame underneath is still sound but the boards are cupped, cracked or gray, we can replace just the decking without tearing out the whole structure. Cuts the cost compared to a full rebuild.

Deck Demolition & Removal

Old deck coming down to make room for a new one, or just coming down because it's not safe anymore. We haul everything off, including the old footings if they're in the way.

Screened Porch & Deck Covers

Covering part of a deck with a roof or screen keeps the sun and bugs off without building a full room addition. We tie the new framing into the existing deck structure, not just bolted onto the surface.

Deck Post & Footing Repair

Posts that have sunk or footings that have cracked are a structural problem, not a cosmetic one. We dig out the old footing, pour a new one below frost depth, and tie the post back in properly.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Socorro, TX

We travel to most of the El Paso area for deck work.

Socorro, TX
El Paso, TX
Horizon City, TX
Sunland Park, TX
San Elizario, TX
Santa Teresa, TX
Fabens, TX
Anthony, TX
Canutillo, TX
Clint, TX
Vinton, TX
Common Questions

Things worth asking

Questions that come up once a project gets real.

Do I need a permit to build a deck?
Most raised decks attached to a house require a building permit, while small ground-level platforms sometimes don't, depending on local code. Permit applications and inspection scheduling are typically handled as part of the deck construction job where one is required.
How long does it take to build a deck?
A standard deck usually takes a few days to a week to frame and finish once footings have cured, and curing itself takes a couple of days after the concrete is poured. Larger multi-level decks or ones with a roof cover take longer, closer to two or three weeks.
Can you build a deck on a tight budget?
Pressure-treated pine costs less than composite or cedar and still holds up well if it's sealed on a regular schedule. Keeping the footprint simple, skipping extra levels or built-in features, is usually the biggest cost saver.
Do you offer any kind of guarantee on the work?
Workmanship is typically covered for a set period after completion, spelled out in writing in the contract. Material warranties vary by manufacturer, composite decking brands usually cover the boards themselves for a much longer period than labor is covered.
Who will I be dealing with during the project?
The same crew that measures the site and writes the quote is the crew that builds the deck, rather than being handed off between an estimator and a separate construction team. Any changes mid-project get discussed directly with the person doing the work.
What decking materials do you work with?
Pressure-treated pine, cedar and composite decking cover most jobs, each with a different cost, lifespan and maintenance schedule. Pine requires resealing every two to three years in this climate, cedar a bit less often, composite essentially never but costs more upfront.
Can I still use my yard or house while the deck is being built?
Deck construction doesn't require leaving the house, though the immediate yard area around the build site needs to stay clear for equipment and material staging. Access to doors near the work area may be limited for a day or two during framing.
What do I need to do to prepare before the crew arrives?
Clearing furniture, planters or grills off the existing deck or the build area makes the first day go faster. Marking the location of sprinkler lines or buried cables near the footing locations helps avoid delays once digging starts.
What happens if you find rot or damage once the old deck comes down?
Hidden rot in the rim joist or ledger board sometimes doesn't show until the old decking is pulled up, especially if water's been getting behind the siding for years. When that happens, it gets priced separately and explained before any extra work starts, rather than buried in the final bill.
How do I take care of a new deck once it's built?
Pressure-treated and cedar decks require resealing every two to three years in this sun, sooner if the boards start to gray. Composite decking just requires occasional washing, but railings and fasteners on any material should get a visual check once a year for loose connections.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (915) 221-2610